  1. Article 1 In order to strengthen the maintenance and management of urban underground pipelines, ensure pedestrians and driving safety, and maintain the integrity of urban infrastructure, in accordance with the "Regulations on the Administration of Urban Road Management", "Regulations on the Management of Hangzhou Municipal Facilities", and relevant laws and regulations The provisions are formulated in combination with the actual situation of the city. Article 2 These Measures are applicable to various underground pipelines such as water drainage, electricity, radio and television, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, telecommunications, gas, thermal power, tap water, sanitation, public security, etc. Management. Article 3 The administrative department of Hangzhou Municipal Facilities is responsible for organizing and implementing these measures. Article 4 The underground pipeline cover shall meet the design standards stipulated by the state. The installation and construction of the underground pipeline cover on the urban road must meet the requirements of urban road construction technical specifications.
    The connection between the underground pipeline cover and its base should be closely and stable. The metal cover and the base should be used to locate the connection.
    The underground pipeline covers and bases must indicate the nature or industry logo. Different types of underground pipelines are prohibited mixed with each other.
    The underground pipeline cover and base of the above provisions shall not be replaced by the municipal municipal facility administrative department to determine that the property rights unit will be replaced within a time limit. Article 5 The daily maintenance and management of the underground pipeline cover shall be responsible for their property rights units.
    The city municipal facilities administrative department is responsible for supervising the daily maintenance and management of the property rights unit on its underground pipeline cover, and has the right to instructed the property rights units to repairs in time, replace the underground pipeline cover, and take other security prevention measures. Article 6 The property rights units shall establish and improve the maintenance and management responsibility system for the underground pipeline covers, equipped with inspectors, and conduct regular inspections on the underground pipeline cover of the underground pipeline.
    The municipal facilities management agency shall not be less than twice a week on the underground pipeline cover on the road of responsibility; other property rights units shall not be less than once a week for the underground pipeline cover. Each inspection and inspection responsible person must be registered in the case. Article 7 The property rights units shall open a 24 -hour underground pipeline cover to report the dedicated line of the special line and the special line to spread, and are equipped with contact personnel. Article 8 If the property units of all property rights find the defect of the underground pipeline cover of the underground pipeline belonging to the affiliated, it shall be immediately covered; if it cannot be covered for a while or does not belong to the scope of its own responsibility, it shall immediately adopt temporary protection that can ensure the safety of pedestrians and driving safety. Measures set up warning signs, and immediately notify relevant property units to deal with. If the property rights unit cannot be determined for a while, the municipal facility management agency shall be notified to deal with it.
    Hesence of the administrative departments of each property rights unit or municipal facilities, after receiving notifications or reports from relevant units, they should arrive at the scene within an hour, deal with it in accordance with the provisions of the preceding paragraph, and feedback the relevant units.
    The expenses incurred due to the handling of handling are borne by the property unit. Article 9 If the daily maintenance and management of the property unit's daily maintenance and management of the underground pipeline cover, the professional management institution may be entrusted to maintain and manage the professional management agencies. The entrusted parties shall sign the commissioned maintenance and management agreement to clarify the rights and obligations of both parties. Article 10 No unit or individual may move the underground pipeline cover without authorization. When the property rights unit conducts the underground pipelines to inspect, maintain, maintain, and build the operation, set up guardrails, warning signs or other security measures around the well outside the well. After the operation, the scene should be cleaned in time to restore the original state. Article 11 Any unit or individual has the obligation to protect the underground pipeline cover, stop damage to the underground pipeline cover, and report the defects of the underground pipeline cover.
    The stolen, damage, and underground pipeline cover of any unit or individual.
    The non -public security organs are strictly forbidden to approve the fixed -point waste materials recycling unit to acquire waste underground pipelines. When approved the fixed -point waste materials recycling unit, when acquiring waste underground pipelines, it should be found that its source should be found. Article 12 The administrative departments of municipal facilities and all property rights units shall establish and improve various supervision, inspections, and assessment systems, and implement the daily maintenance and management responsibilities of underground pipelines. Article 13 Each property unit violates these Measures and does not repair the underground pipeline cover with defects in accordance with the prescribed time limit. The urban management administrative law enforcement organs shall be punished immediately in accordance with the standard of 1,000 yuan per day for a day. Article 14 Due to the defects of the underground pipeline cover and cause accidents such as casualties and property losses, the property rights unit shall bear the liability for compensation in accordance with the law, and investigate the administrative responsibility of the leaders and direct responsible persons in accordance with the law. criminal responsibility. Article 15 Anyone who violates these measures and involves other laws and regulations shall be punished by relevant departments in accordance with the law. Article 16 These Measures shall be implemented from the date of release.