1 thought on “The corporate factory building needs to be built at that time to find that department.”

  1. Engineering and technical department. According to the relevant information, the cost consulting unit is an unit that belongs to engineering technology services. The competent department is the local city housing and urban and rural construction administration bureau. The unit's business license, qualification level and business scope are all handled by the Housing and Urban Construction Bureau. The construction of the factory is based on the project, and then the design drawing, drawing review, fire approval, lightning protection design approval, issuing red -line topographic maps (sealing of the local government urban construction department), and the review and approval of the construction bureau can be built normally after review and approval. It's right.